West End (Station 2137 at SR 79 to Station 2190)

  • Gas utility contractor relocation work ongoing near SR 79 utilizing both open trench and directional bore methods of installation.
  • Utility construction-related traffic control and water quality protection present.
  • Old rail road bridge trestle at Old Bradford Road removed.
  • Utility delay regarding repositioning of AT&T fiber optic lines with expected completion date in October.


East End (Station 2200 to Station 2235 at SR 75)     


Environmental Status this reporting period:

  • 5 Rain Days: July 14 (0.17”), July 15 (0.27”), July 18 (0.10”), July 19 (0.37”), July 23 (0.20”).
  • Total rainfall less that 1.1"
  • No water quality violations.



 